The Goal: Complete kitchen remodel of the cabin in four days!

Initial Task breakdown:

1) Tear out most of the old cabinets – Done

2) Repaint remaining cabinets, add appliques and new hardware – Done

3) New floor – Done after four restarts (see below)

4) New counter-top – Done without chipping!!!!!!!

5) Create sink base out of 150 year old dresser and 1923 vintage sink – Done – Previous owner of dresser would cry. She was so proud of her refinish job. Sorry.

6) Rebuild 1920’s vintage faucet – Done – Try to find seats and washers that fit!

7) Add wainscoting to walls and paint – Done – Crooked walls and sagging ceiling made for no straight lines

Additional tasks due to age and condition of cabin:

1) Replace sub-flooring – Done – See comments below

2) Try to lay straight flooring over warped floor with walls that are not square – Arrrgh! Done!!!

The domestic CEO and I decided to convert a 1980’s style kitchen with more cabinets than floor space into a more open and lighter kitchen from the…say 1940’s. When we bought the cabin a year ago, it had been neglected for several years and needed a LOT of work. We spent last fall and winter making it weather tight.

That meant the kitchen was next. At 140 square feet, this is not a big space and the existing layout left no room for two people to move around. So, the CEO/Architect/subcontractor got busy locating the pieces we would need. that left the General Contractor (Me) to come up with the work plan. When we told friends the plan was to complete the project in four days they ALL laughed hysterically. The nerve. \

In the end they were right. it actually took us six days. The delays were found in two places. First the sub-floor under the fridge and existing sink base was so rotted that we had to replace it. Interestingly we found three floor surfaces below the vinyl flooring we planned to cover. The second major delay came with trying to lay wood laminate floor in an old house. There were no straight corners and the floor was warped and sagging in spots. I had to restart the new floor three times before I finally got the hang of it on the fourth try.

We are thrilled with the results and keep reminding ourselves that it is a cabin. Below are the before and after pics.

Old fridge position - note the room between fridge and opposite couter

Old fridge position – note the room between fridge and opposite counter

New position with 'new' sink

New position with ‘new’ sink

Previous sink and corner counter

Previous sink and corner counter

'New" Sink and Corner

‘New” Sink and Corner

'New' cabinets

‘New’ cabinets and counter – Note the high-end commercial-grade stove. It makes great pies.

TaDa! Complee with floor.

TaDa! Complete with floor.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Now two people can live and cook in the kitchen. It just works. For the record, the punched tin chandelier was hand-made by my mother, the true artist of the family.

Advertisements
 
11 Comments

Posted by on October 31, 2013 in Musings and Odd Thoughts

 

Tags: , , , , , , , ,

11 responses to “Domestic Project – Finished

  1. Traci

    October 31, 2013 at 6:27 am

    I am amazed. What a fantastic remodel! Please tell me that you had more than two people working on this, or I will forever feel inadequate.

     
  2. 4amWriter

    November 1, 2013 at 6:12 am

    Great work! I think re-doing a kitchen is hard because there are so many things you have to consider to make it a workable, comfortable, efficient room. Looks like you nailed it. (Pun intended.)

    The previous owners of the house where we now live left all of their punched-tin chandeliers. Crazy! They weren’t hooked up to electricity, so I converted them into candle holders.

     
    • Dennis Langley

      November 1, 2013 at 12:53 pm

      Thanks. There was a lot of nails used in this project, for sure. Converting the chandeliers to candles is a great idea. That way you get the soft flickering light that helps to inspire us writer types.;-)

       
  3. Jade Reyner

    November 3, 2013 at 12:59 pm

    Very impressive! Shame you live so far away… I have a kitchen re-model just begging to be done. LOL 🙂 And of course, the most credit goes to the CEO. 😀

     
    • Dennis Langley

      November 5, 2013 at 11:47 am

      Airline fare for the CEO and myself, room and board plus expenses added to the remodel costs. We’re not that far away
      The CEO and I have a very structure work-role delineation which works well for us whether its a kitchen remodel or landscaping project.

       
      • Jade Reyner

        November 5, 2013 at 11:54 am

        Ha ha – you don’t want much then??! LOL.

        I love the phrase ‘domestic CEO’ – I presume she is happy with that title? 🙂

         
      • Dennis Langley

        November 5, 2013 at 11:56 am

        She prefers Queen but, I told her that was already taken. 🙂

         
      • Jade Reyner

        November 5, 2013 at 12:02 pm

        Hmmm… at least you know your place. 🙂

         
      • Dennis Langley

        November 5, 2013 at 12:17 pm

        Absolutely!

         

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

 
%d bloggers like this: